



These photos show the generator supply and installation works completed at Broomfield Hospital. We supplied two 650kVA open generators and a parallel switchboard as part of a major power upgrade, replacing the original 2 x 300kVA units with 2 x 650kVA units in the existing plant room. To accommodate the increased capacity within the same space, bespoke silencers were designed and the exhaust flue was re-routed.
The images include both the offload and final installation stages.
Get In Touch
sales@generatorpowersystems.co.uk
View on Google Maps
The Old Cadman Site
Moss Road
Stanway
Colchester
Essex
CO3 0LF
Mon - Fri, 9-5:30
Sat - Sun, 9-4
