


A new mains control panel was installed to manage the two newly fitted mains switchboards on site. This panel is responsible for controlling both mains supplies, coordinating the bus coupling between the two switchboards, and operating the standby generator in the event of a total mains power failure.
Other Case Studies
Get In Touch
sales@generatorpowersystems.co.uk
View on Google Maps
The Old Cadman Site
Moss Road
Stanway
Colchester
Essex
CO3 0LF
Mon - Fri, 9-5:30
Sat - Sun, 9-4
